Exterior wall is completely down now.  Standing in the addition, you can really get a good feel for what the rooms are going to be like.  Feels like progress.

IMG_20160901_164541 IMG_20160901_164407 IMG_20160901_164617 IMG_20160901_164611 IMG_20160901_164605 IMG_20160901_164600 IMG_20160901_164549 IMG_20160901_164537 IMG_20160901_164533 IMG_20160831_170102

So
So nice to take a shower that isn't in a total construction area

IMG_20160906_135952

Sink is in but not hooked up entirely.  Mirror not up.

IMG_20160906_140003

Toilet in and functional but baseboard trim not done...

IMG_20160906_140010

Shower in and functional but water hookup in wall still screwed up...

So
IMG_20160902_164739

The calm before the crane

IMG_20160906_102013 IMG_20160906_102201 IMG_20160906_102234 IMG_20160906_102258 IMG_20160906_103203IMG_20160906_103627

Second floor steel placed

IMG_20160906_104112 IMG_20160906_104119 IMG_20160906_102021

Third floor steel placed

Video of the crane in action:

[video width=“1920” height=“1080” mp4=“http://bexleyhillbillies.mobrec.com/wp-content/uploads/2016/09/VID_20160906_104106.mp4"][/video]

[video width=“1920” height=“1080” mp4=“http://bexleyhillbillies.mobrec.com/wp-content/uploads/2016/09/VID_20160906_103959.mp4"][/video]

[video width=“1920” height=“1080” mp4=“http://bexleyhillbillies.mobrec.com/wp-content/uploads/2016/09/VID_20160906_102139.mp4"][/video]

So
img_20160907_170204

This may be the last one of these Frog dumpsters we see for a little while as we should be moving from destruction to construction.  And, yes, the guy who comes to collect the dumpsters has a bright green shirt with big white letters on it saying “Frog Man”.

img_20160907_170018 img_20160907_170048

Framing in the new roof line and side walls on the second floor

img_20160907_170102 img_20160907_170112

Looks like they really swept out the first floor.

Hmm, that is one hella crack in that floor rafter.  That will have to be replaced. I guess that happens when you drop hundreds of pounds of brick and masonry from two or three stories up.

So
img_20160909_161745img_20160909_161739img_20160909_161644

Green cladding going on and the roof is getting built out

img_20160909_162215img_20160909_162302      img_20160909_162321 img_20160909_162311 img_20160909_162247 img_20160909_162244 img_20160909_162235 img_20160909_162215

The build out on the second floor is like a big veranda at the moment.

img_20160909_162146

Opening from the master bedroom out to the addition.

img_20160909_162200

Masonry guy showed up and started cutting through the exterior wall in the master bedroom.  After a couple of hours of this the entire room looked like the surface of Mars.  The room was covered up to about a quarter of an inch with very fine red powder.  This giant cut is the only visible sign of progress otherwise.

img_20160910_105508

We certainly are not used to looking out the third floor window and seeing people standing out there :)

img_20160909_162208

Here is a view of the neighbor's construction site (courtesy of the backhoe crazy dude who apparently doesn't know what a saw is).

So
img_20160912_165354 img_20160915_172645

Exterior brick removed on second floor – as see from the master bedroom

img_20160915_172635 img_20160915_172624

Temporary wall in the bedroom to facilitate exterior brick removal.

img_20160912_165837

First floor – where the old and new meet

img_20160912_165830

Flooring stripped from the old solarium

img_20160912_165821

img_20160912_165813 img_20160912_165801

img_20160912_165756

First floor exterior brick has yet to be removed.  Having that wall there isn't going to make it easy.

img_20160909_162302 img_20160909_162215

img_20160909_162208img_20160915_172849

Meanwhile at the construction site next door...

So
img_20160919_172510img_20160919_172606img_20160919_172529

New floor in the solarium is taking shape

img_20160919_173128 img_20160919_173118

Master bedroom getting framed.

img_20160919_173033

The view from the second floor.  That used to be our backyard before it became the dust bowl.

img_20160919_172903

Windows are a handy place to leave lumber

img_20160919_173229 img_20160919_173219

Cross section of the original brick exterior wall

img_20160919_173114

Looking tup to the 3rd floor

img_20160919_173050

Don't use this window as a door.

img_20160919_172955img_20160919_172851

That back wall was part of the former notch master bathroom

img_20160919_172926 img_20160919_172856  img_20160919_172847img_20160919_172836

Master bedroom framing of bathroom and walk in closets

So
img_20160920_172005 img_20160920_171928img_20160920_171934

Initial framing for to-be walk in closet in master bedroom

img_20160920_171921img_20160920_171832

Master bedroom windows – these are really going to brighten up the room.  For reference, that this the wall that had the hidden fireplace on it.

img_20160920_171855

2nd floor bedroom with all of the networking gear covered up.

img_20160920_171840img_20160920_171850

Windows in the 2nd floor bedroom

img_20160920_175341

Kitchen framing keeps on truckin

img_20160920_175352img_20160920_175402

Afternoon sun coming in the (temp) door to the to-be mudroom

img_20160920_175220img_20160920_175211

Leaving room for mechanicals to be run in the floor

img_20160920_171915 img_20160920_171905

Bathroom and closet framing is making progress.

So
img_20160921_172608

Ooops, someone forgot that there is supposed to be a window there, not a wall.

img_20160921_172637

They did a nice job shearing back the brick (where the exterior wall used to be) so that it will fit nicely behind the wall that is being built out

img_20160921_172632 img_20160921_172628

More framing on the original exterior wall of the house (circa 1970)

img_20160921_172249 img_20160921_172243

Stripped the master bedroom floor down to the subfloor

img_20160920_172005

They left the original hardwood flooring in the to-be closets.

img_20160921_172221

Other bedroom on 2nd floor with all of our networking gear mounted on the wall.  That needs to go this weekend so they can frame in that wall properly.  You can also see the start of the plumbing for the master bathroom on the other side of the left wall.

So
img_20160923_184622 img_20160923_184602 img_20160923_184651img_20160923_184552

This is probably one of the few times that I am actually happy to see windows installed (geek humor).

img_20160923_184712 img_20160923_184706

It took the knucklehead plumber all day to install about 9 feet of PVC pipe (poorly).

img_20160923_184612

Scrap wood becomes a fishy mascot