Frame Frame Frame Frame Frame

So
img_20160920_172005 img_20160920_171928img_20160920_171934

Initial framing for to-be walk in closet in master bedroom

img_20160920_171921img_20160920_171832

Master bedroom windows – these are really going to brighten up the room.  For reference, that this the wall that had the hidden fireplace on it.

img_20160920_171855

2nd floor bedroom with all of the networking gear covered up.

img_20160920_171840img_20160920_171850

Windows in the 2nd floor bedroom

img_20160920_175341

Kitchen framing keeps on truckin

img_20160920_175352img_20160920_175402

Afternoon sun coming in the (temp) door to the to-be mudroom

img_20160920_175220img_20160920_175211

Leaving room for mechanicals to be run in the floor

img_20160920_171915 img_20160920_171905

Bathroom and closet framing is making progress.