Inside Job
So
Ooops, someone forgot that there is supposed to be a window there, not a wall.
They did a nice job shearing back the brick (where the exterior wall used to be) so that it will fit nicely behind the wall that is being built out
More framing on the original exterior wall of the house (circa 1970)
Stripped the master bedroom floor down to the subfloor
They left the original hardwood flooring in the to-be closets.
Other bedroom on 2nd floor with all of our networking gear mounted on the wall. That needs to go this weekend so they can frame in that wall properly. You can also see the start of the plumbing for the master bathroom on the other side of the left wall.