Mid-Week Progress

So
img_20160912_165354 img_20160915_172645

Exterior brick removed on second floor – as see from the master bedroom

img_20160915_172635 img_20160915_172624

Temporary wall in the bedroom to facilitate exterior brick removal.

img_20160912_165837

First floor – where the old and new meet

img_20160912_165830

Flooring stripped from the old solarium

img_20160912_165821

img_20160912_165813 img_20160912_165801

img_20160912_165756

First floor exterior brick has yet to be removed.  Having that wall there isn't going to make it easy.

img_20160909_162302 img_20160909_162215

img_20160909_162208img_20160915_172849

Meanwhile at the construction site next door...