bexleyhillbillies

So
A little pre-work before the major construction starts.

IMG_20160529_105331

The existing walkway swings over to the driveway that is eventually going away.  Since most people (including the mailman and my daughter) walk straight across the lawn anyway, we decided to put the path where people actually walk.  This was a three weekend project as we had a few hours in the morning to do the work before we were roasting in the mid-day sun.

IMG_20160529_105211

It just happened to work out that we had exactly the right amount of stones to do the work.  This is nice considering having to buy matching stone would have been a real challenge.

IMG_20160529_105223

I can't tell you how many people stopped by to offer helpful suggestions like 'you know you can pay someone to do that for you, right?'  But what if we enjoy doing this sort of thing?

IMG_20160530_111414

IMG_20160530_111432

The finished product gets a lot of compliments and actually looks like it has always been there.

So
IMG_20160717_171234

Drywall gone and the guts are hanging out

IMG_20160717_171353

Let's take a whack at the floor just to see what is under the tile .

IMG_20160717_171326IMG_20160717_171334

Now these look original – ceramic insulators that probably had cloth wrapped wiring in them at some point (some of them still do).

IMG_20160717_171249

The light still works...

IMG_20160717_171445IMG_20160717_171458

Previous owners claimed that these built-ins where 'original'.  I don't think they did much, if any, building with cheap plywood in 1912.

IMG_20160717_171451

IMG_20160717_171223 IMG_20160717_171204

Lots of network wires, pipes and electrical where no one expected them to be.  This is going to get interesting...

image

The deck is hacked up and pulled out

image

Neatly stacked in a trailer and hauled away

IMG_20160629_173844

Leaving a big step down from the back door and the exposed skeleton of some sort of animal in the dirt.  Apparently, when they put the deck in, they couldn't be arsed to pour proper concrete footers for the supports.  No, no, they just dug them in about 10-12 inches and called it done.

IMG_20160629_173933

And part of the fence was cut out to allow for construction access.  The real problem with that is that now the dogs have to go out on a leash instead of being left to run (unattended) in the morning.

So
Two 12 hour days of laying block for the foundation.

IMG_20160714_191327IMG_20160714_191333

IMG_20160715_174815IMG_20160715_174836

IMG_20160715_174943IMG_20160715_174908

IMG_20160715_174859IMG_20160715_174844

IMG_20160717_095755IMG_20160717_095801

IMG_20160717_095812IMG_20160714_191323

IMG_20160713_170725

Running concrete from the front of the house to the back

IMG_20160717_151447IMG_20160717_095755IMG_20160717_095801IMG_20160717_151346

 

IMG_20160717_151337IMG_20160717_151358

IMG_20160717_151413IMG_20160717_095812

IMG_20160717_095806IMG_20160715_174836

 

IMG_20160717_095755IMG_20160712_210934

Two 12 hour days of laying block for the foundation.

IMG_20160714_191327IMG_20160714_191333

IMG_20160715_174815IMG_20160715_174836

IMG_20160715_174943IMG_20160715_174908

IMG_20160715_174859IMG_20160715_174844

IMG_20160717_095755IMG_20160717_095801

IMG_20160717_095812IMG_20160714_191323

IMG_20160713_170725

Running concrete from the front of the house to the back

IMG_20160717_151447IMG_20160717_095755IMG_20160717_095801IMG_20160717_151346

 

IMG_20160717_151337IMG_20160717_151358

IMG_20160717_151413IMG_20160717_095812

IMG_20160717_095806IMG_20160715_174836

 

IMG_20160717_095755IMG_20160712_210934

IMG_20160712_211102

Step one, move all the stuff from the deck and back yard into the driveway  at the side of the house.

IMG_20160712_211151

Get the backhoe and get to the backdoe and get diggin

IMG_20160712_211116

So long, driveway to no where

IMG_20160712_211209

Along the back of the house.  Note the two mystery conduits coming into the basement.  Too high to be water or sewer.  Rather than solve the mystery, they just worked around them.

IMG_20160712_211222

What to do with all the dirt

IMG_20160712_211238

Looking down the drive toward the front of the house

IMG_20160713_072159

Not the normal view from the kitchen window

IMG_20160719_175519 IMG_20160719_175547 IMG_20160719_175525IMG_20160719_175541

So
The framers showed up with around 6 guys and banged all the to-be flooring over the foundation in a couple of hours.  They spent the rest of the time filling the back yard with lumber.

IMG_20160721_174805

Upper deck and the ugly attempt to hide the ugly old addition.

IMG_20160721_174746

Existing kitchen level (upper) and raised solarium extension (lower)

IMG_20160721_174756

Extension decking with bump out for the mud room on the driveway side.

IMG_20160721_174740

Two foot extension on the driveway side of the house

IMG_20160721_174818

Wacking in some pilot holes to see where the 2nd floor floor level is located (and what the state of it is). Center of house.

IMG_20160721_174837

Right side pilot hole

So
Friday saw both the plumber and the demo guy doing their thing in the second floor bathroom.  Most all of the pipe were removed as well as all of the tile around the shower.  Plumber can't do more until the demo guy gets the shower out of the way (in theory, that happens on Monday).

Fun fact: the drain in this shower backs up and drains slowly not because it is clogged but because it runs uphill instead of down.  Well done previous owners!

IMG_20160723_095905

Floor pulled up and pipes pulled out

IMG_20160723_095927

Shower tile surround gone.  Salvaged the shower door to re-use later.

IMG_20160723_095943

All those wires and pipes that no one counted on.

IMG_20160723_095839

Shower tile removed

IMG_20160723_095858

There is a floor under there somewhere...

IMG_20160723_095921

Floor removal in what was previously the closet

IMG_20160723_095936

Old insulators and wiring

IMG_20160723_095846

Dangling utilities after the wall joists have been cut out.

Friday saw both the plumber and the demo guy doing their thing in the second floor bathroom.  Most all of the pipe were removed as well as all of the tile around the shower.  Plumber can't do more until the demo guy gets the shower out of the way (in theory, that happens on Monday).

Fun fact: the drain in this shower backs up and drains slowly not because it is clogged but because it runs uphill instead of down.  Well done previous owners!

IMG_20160723_095905

Floor pulled up and pipes pulled out

IMG_20160723_095927

Shower tile surround gone.  Salvaged the shower door to re-use later.

IMG_20160723_095943

All those wires and pipes that no one counted on.

IMG_20160723_095839

Shower tile removed

IMG_20160723_095858

There is a floor under there somewhere...

IMG_20160723_095921

Floor removal in what was previously the closet

IMG_20160723_095936

Old insulators and wiring

IMG_20160723_095846

Dangling utilities after the wall joists have been cut out.