Friday saw both the plumber and the demo guy doing their thing in the second floor bathroom. Most all of the pipe were removed as well as all of the tile around the shower. Plumber can't do more until the demo guy gets the shower out of the way (in theory, that happens on Monday).
Fun fact: the drain in this shower backs up and drains slowly not because it is clogged but because it runs uphill instead of down. Well done previous owners!
Floor pulled up and pipes pulled out
Shower tile surround gone. Salvaged the shower door to re-use later.
All those wires and pipes that no one counted on.
Shower tile removed
There is a floor under there somewhere...
Floor removal in what was previously the closet
Old insulators and wiring