Bathroom Demo part deux

Friday saw both the plumber and the demo guy doing their thing in the second floor bathroom.  Most all of the pipe were removed as well as all of the tile around the shower.  Plumber can't do more until the demo guy gets the shower out of the way (in theory, that happens on Monday).

Fun fact: the drain in this shower backs up and drains slowly not because it is clogged but because it runs uphill instead of down.  Well done previous owners!

IMG_20160723_095905

Floor pulled up and pipes pulled out

IMG_20160723_095927

Shower tile surround gone.  Salvaged the shower door to re-use later.

IMG_20160723_095943

All those wires and pipes that no one counted on.

IMG_20160723_095839

Shower tile removed

IMG_20160723_095858

There is a floor under there somewhere...

IMG_20160723_095921

Floor removal in what was previously the closet

IMG_20160723_095936

Old insulators and wiring

IMG_20160723_095846

Dangling utilities after the wall joists have been cut out.