So
The existing tub in the 2nd floor bathroom was smashed/cut to bits and hauled out. The original plan was to keep the existing shower but the discovery of the wires and pipes is forcing the room to basically be 'flipped' (shower on the right side of room instead of left).  Small compromise, but saves a lot of headaches.  It is good to be flexible :)

IMG_20160726_170236 IMG_20160726_170222 IMG_20160726_170211

So
Our fridge had to move from the kitchen...

IMG_20160725_162945

...into the dining room

IMG_20160725_163007

It is still plugged into the electrical.  We do miss having the water and ice dispenser, though.

So
Once again, the framers waste no time getting to work.  They did all of this in about 6 hours today.  The lead guy said that it was 'going so slow' because they normally build the wall framing on the ground and just stand it up and nail it in place.  Apparently that technique doesn't work so well for a three story tall wall that also has to be attached to an existing structure.

IMG_20160726_172527 IMG_20160726_172519

There is the bump out for the mudroom

IMG_20160726_172448

This will be the French doors to the back patio

IMG_20160726_172428

New kitchen window near the corner

IMG_20160726_172420

New windows over the kitchen sink

IMG_20160726_172409

The start of the first floor exterior wall

IMG_20160726_172337

Reverse view of the exterior wall

IMG_20160726_172249

Side of the house near the fenceline

IMG_20160726_172232

View of the to-be French doors from the yard

IMG_20160726_172217

Exterior wall from the corner

IMG_20160726_172207

Long shot

IMG_20160726_172155

Around the corner

IMG_20160726_164648

View from 2nd floor office room

So
IMG_20160729_170546  IMG_20160729_170530

The floor joists were so hacked up over the years that they had to put in 'sister' joists to shore things up (see the original wood sandwiched between new?)

IMG_20160729_170541 IMG_20160729_170551

The sub-floor is probably as clean as it has ever been in 100 years.  Some of the plumbing is roughed in but the going is slow. I gotta say, if those two copper pipes in the center are supposed to be for the new shower, they are in the wrong place.

IMG_20160729_170557

Temp flooring where the shower used to be.

IMG_20160729_170614

Ignore those construction workers behind the curtain!

IMG_20160726_164641

It all started with a small hole in the floor to see how the joists ran.

IMG_20160729_170636

Then the ceiling got partially ripped out and a hole chopped in it

IMG_20160729_170641 IMG_20160729_170657 IMG_20160729_170718

A closer look at what is under the 3rd floor

IMG_20160729_170838

View out the 2nd floor window – they have topped up the framing so that it is more or less even with the floor line of the second floor

IMG_20160729_170831

Dumpster and lumber yard in the back yard from 2nd floor.

IMG_20160730_095118

IMG_20160730_095132

Two views from the backyard by the fence and a little closer.  By the time they get the second floor wall up, no one will be able to see the house from the alley.  And there was much rejoicing!

So
Temporary pole to re-route the utilities during construction

IMG_20160802_185506 IMG_20160802_185418 IMG_20160802_185401

So
IMG_20160806_164435

IMG_20160806_164428

As they keep whacking holes into the exterior to determine the proper alignment of the inside with the outside they decided to nail up a great big blue tarp to keep the weather out (should it ever rain again).

IMG_20160806_164339 IMG_20160806_164320 IMG_20160806_164313 IMG_20160806_164303

IMG_20160806_164708 IMG_20160806_164701 IMG_20160806_164653 IMG_20160806_164647 IMG_20160806_164638 IMG_20160806_164631

IMG_20160806_164557

This is downstairs in the kitchen where the fridge used to be.  You can look up and see the ceiling in the bathroom.  This is supposed to be finished and inspected on Monday.

So
IMG_20160808_121759 IMG_20160808_121755 IMG_20160808_121748 IMG_20160808_121720 IMG_20160808_121713 IMG_20160808_121705 IMG_20160808_121650 IMG_20160808_121645

So
IMG_20160808_121333

Section of the floor in the master 'closet' that was hacked out to check floor joist alignment with the outside.

IMG_20160808_121323

The other side of the master 'closet' with the lovely coaxial cable running through the space.

IMG_20160808_121424

IMG_20160808_121418

Floor show in the room next to the master on the 2nd floor

IMG_20160808_121431

Another view of the lovely blue tarp covering the back of the house and the first floor rough framing.

So
IMG_20160815_164138 IMG_20160816_165358

The blue and red lines will eventually be the hot/cold hookup for the shower.

IMG_20160816_165342

The old (foreground) and the new exhaust fan.  The irony is that the smaller/new fan moves 3x as much air as the old one.

IMG_20160816_165335

Framing in the raceway for all the wires, etc running up to the third floor.

IMG_20160815_164254 IMG_20160815_164242

Electrical getting roughed in and the old cloth-wrapped wire is gone.

IMG_20160815_164235 IMG_20160815_164224

Filling in the cracks

IMG_20160815_164213

Wall where the main switches are (and where the towel warmer will be mounted).

IMG_20160815_164202

All the overhead stuff has been cleaned up, too.

IMG_20160815_164155 IMG_20160815_164145

Hey, look, there is actually a floor in the room now!