Slow Week

So
img_20161007_174830 img_20161007_175334 img_20161007_174958 img_20161007_175349 img_20161007_175343 img_20161007_175319 img_20161007_175258 img_20161007_175250 img_20161007_175240 img_20161007_175223 img_20161007_174950 img_20161007_174922 img_20161007_174912 img_20161007_174817

Slow week for photo-worthy stuff.  Mostly getting the electrical roughed in, getting enough of the plumbing done to have that inspected and beginning to furr out the walls and ceiling to even things out and/or make room for electrical in the solid brick walls.